mchadmin:facilities
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
mchadmin:facilities [2024/07/25 14:34] – fecik | mchadmin:facilities [2024/08/02 08:38] (current) – fecik | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Facilities ====== | ====== Facilities ====== | ||
- | ===== Office equipment ===== | + | ===== Media Supply System |
- | + | ||
- | ==== Smartboards & Beamers ==== | + | |
- | + | ||
- | Three fixed TEAMBOARD smartboards are installed at MCh: | + | |
- | - A big one in Seminar Room, | + | |
- | - One smaller one in the Meeting Room, | + | |
- | - A second small one in the Prof.´s office. | + | |
- | Consumables (pencils, cleaning towels, cleaning liquid etc.) are available in the copy room. | + | |
- | + | ||
- | <note tip> | + | |
- | Light bulbs for all smartboards are identical, no matter which size. A spare light bulb can be found in the IT consumables cabinet in the [[mchadmin: | + | |
- | </ | + | |
- | ==== Beamers ==== | + | |
- | === Fixed beamers === | + | |
- | We have one fixed beamer in the APT lab right above the machine. | + | |
- | === Portable beamers === | + | |
- | We currently have 2 portable beamers: One very old, heavy one and one small and light one. Both can be found in the locked IT cabinet in the [[mchadmin: | + | |
- | + | ||
- | ==== Video conference system ==== | + | |
- | + | ||
- | Funded by DFG in the frame of the collaborative research center (Sonderforschungsbereich) SFB-TR 87, we have Tandberg C20 video conference system in the meeting room (02_216). | + | |
- | This system allows for IP-based video conferencing via two large flatscreens and may be principally connected to any IP-conference system throughout the world. | + | |
- | + | ||
- | {{: | + | |
- | + | ||
- | =====Media | + | |
==== Gases ==== | ==== Gases ==== | ||
Line 38: | Line 12: | ||
* Nitrogen 4.8 | * Nitrogen 4.8 | ||
* Oxygen 5.0 | * Oxygen 5.0 | ||
- | * Hydrogen 5.0 only in certain locations | + | * Hydrogen 5.0 (only in certain locations) |
- | ==== Pressurized | + | More information can be found in [[mchequip: |
+ | |||
+ | ==== Pressurized | ||
The pressurized air system is available at a maximum pressure of 8 bar. The air quality is standard technical air, it may contain oil residues and humidity to a certain extend. | The pressurized air system is available at a maximum pressure of 8 bar. The air quality is standard technical air, it may contain oil residues and humidity to a certain extend. | ||
Line 51: | Line 27: | ||
- | =====Air | + | ===== Air Ventilation System |
The MCh building is locally equipped with an air ventilation system located on the roof installation center. | The MCh building is locally equipped with an air ventilation system located on the roof installation center. | ||
- | <note tip> | + | <WRAP center round info 70%> |
The air ventilation system is not an air conditioning system! | The air ventilation system is not an air conditioning system! | ||
- | </note> | + | </WRAP> |
This system provides fresh air in the lab floor, and in the office floors, but not in the offices. | This system provides fresh air in the lab floor, and in the office floors, but not in the offices. | ||
Line 65: | Line 41: | ||
</ | </ | ||
- | ===Maintenance schedules=== | + | ==== Maintenance schedules |
The schedules are given out by RWTH central administration, | The schedules are given out by RWTH central administration, | ||
Line 72: | Line 48: | ||
* KW: Kleine Wartung, Small Maintenance, | * KW: Kleine Wartung, Small Maintenance, | ||
- | ===2016=== | + | === 2016 === |
- | ^Sub-system^Dates/extension^^^^ | + | ^Sub-System |
|Abluft, L.11, Graphitstaub, | |Abluft, L.11, Graphitstaub, | ||
|Zu- und Abluft, L.01, Labore, 3.OG|GW 28.01.2016|KW 28.04.2016|MW 28.07.2016|KW 27.10.2016| | |Zu- und Abluft, L.01, Labore, 3.OG|GW 28.01.2016|KW 28.04.2016|MW 28.07.2016|KW 27.10.2016| | ||
Line 85: | Line 61: | ||
- | ====Air | + | ==== Air Cooling/Air Conditioning |
The seminar room and the meeting room are further equipped with a local air cooling system which cools down the standard ambient air supply in order to avoid people to get tired in meetings. | The seminar room and the meeting room are further equipped with a local air cooling system which cools down the standard ambient air supply in order to avoid people to get tired in meetings. |
mchadmin/facilities.1721910893.txt.gz · Last modified: 2024/07/25 14:34 by fecik