User Tools

Site Tools


mchadmin:facilities

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
mchadmin:facilities [2024/07/16 12:27] – [Smartboards & Beamers] fecikmchadmin:facilities [2024/08/02 08:38] (current) fecik
Line 1: Line 1:
-====== Equipment ======+====== Facilities ======
  
-Here you will find documentations of all equipment except for lab equipment listed in the bnext section. +===== Media Supply System =====
- +
-===== Office equipment ===== +
- +
-==== Smartboards & Beamers ==== +
- +
-Three fixed TEAMBOARD smartboards are installed at MCh: +
-  - A big one in Seminar Room, +
-  - One smaller one in the Meeting Room, +
-  - A second small one in the Prof.´s office. +
-Consumables (pencils, cleaning towels, cleaning liquid etc.) are available in the copy room. +
- +
-<note important> +
-Light bulbs for all smartboards are identical, no matter which size. A spare light bulb can be found in the IT consumables cabinet in the [[mchadmin:2ndfloor|copy room]]! +
-</note> +
-==== Beamers ==== +
-=== Fixed beamers === +
-We have one fixed beamer in the APT lab right above the machine. +
-=== Portable beamers === +
-We currently have 2 portable beamers: One very old, heavy one and one small and light one. Both can be found in the locked IT cabinet in the [[mchadmin:2ndfloor|copy room]]. +
- +
-==== Video conference system ==== +
- +
-Funded by DFG in the frame of the collaborative research center (Sonderforschungsbereich) SFB-TR 87, we have Tandberg C20 video conference system in the meeting room (02_216). +
-This system allows for IP-based video conferencing via two large flatscreens and may be principally connected to any IP-conference system throughout the world. +
- +
-{{:videokonferenzsystem_kompatibilitaetsliste.pdf|Video system compatibility list}} +
- +
-=====Media supply system=====+
  
 ==== Gases ==== ==== Gases ====
Line 40: Line 12:
  * Nitrogen 4.8  * Nitrogen 4.8
  * Oxygen 5.0  * Oxygen 5.0
- * Hydrogen 5.0 only in certain locations+ * Hydrogen 5.0 (only in certain locations)
  
-==== Pressurized air ====+More information can be found in [[mchequip:mediasupply|Media Supply System]]. 
 + 
 +==== Pressurized Air ====
  
 The pressurized air system is available at a maximum pressure of 8 bar. The air quality is standard technical air, it may contain oil residues and humidity to a certain extend. The pressurized air system is available at a maximum pressure of 8 bar. The air quality is standard technical air, it may contain oil residues and humidity to a certain extend.
Line 53: Line 27:
  
  
-=====Air ventilation system=====+===== Air Ventilation System =====
  
 The MCh building is locally equipped with an air ventilation system located on the roof installation center. The MCh building is locally equipped with an air ventilation system located on the roof installation center.
  
-__Please note: This is not an air conditioning system!__+<WRAP center round info 70%> 
 +The air ventilation system is not an air conditioning system! 
 +</WRAP>
  
 This system provides fresh air in the lab floor, and in the office floors, but not in the offices. This system provides fresh air in the lab floor, and in the office floors, but not in the offices.
  
-__Please noteFor maintenance this system, incl. its sub-systems, has to be shut down several times a year. Please find the current schedule below:+<note important> 
 +For maintenance this system, incl. its sub-systems, has to be shut down several times a year. Please find the current schedule below
 +</note>
  
-===Maintenance schedules===+==== Maintenance schedules ====
  
 The schedules are given out by RWTH central administration, Facility Management. The schedules are given out by RWTH central administration, Facility Management.
Line 70: Line 48:
   * KW: Kleine Wartung, Small Maintenance, 3h duration.   * KW: Kleine Wartung, Small Maintenance, 3h duration.
  
-===2016===+=== 2016 ===
  
-^Sub-system^Dates/extension^^^^+^Sub-System ^Dates/Extension ^^^^
 |Abluft, L.11, Graphitstaub, EG 3| |MW 28.04.2016| | |  |Abluft, L.11, Graphitstaub, EG 3| |MW 28.04.2016| | |
 |Zu- und Abluft, L.01, Labore, 3.OG|GW 28.01.2016|KW 28.04.2016|MW 28.07.2016|KW 27.10.2016| |Zu- und Abluft, L.01, Labore, 3.OG|GW 28.01.2016|KW 28.04.2016|MW 28.07.2016|KW 27.10.2016|
Line 83: Line 61:
  
  
-====Air cooling/air conditioning====+==== Air Cooling/Air Conditioning ====
  
 The seminar room and the meeting room are further equipped with a local air cooling system which cools down the standard ambient air supply in order to avoid people to get tired in meetings. The seminar room and the meeting room are further equipped with a local air cooling system which cools down the standard ambient air supply in order to avoid people to get tired in meetings.
mchadmin/facilities.1721125653.txt.gz · Last modified: 2024/07/16 12:27 by fecik