blog:building
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
blog:building [2018/09/17 14:38] – [Keys] simon | blog:building [2024/07/16 10:50] (current) – removed fecik | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== MCh Building ====== | ||
- | MCh is currently located in Kopernikusstraße 10 and shares the building with the Industrial Furnaces Institute (Industrieofenbau, | ||
- | We moved into the current building in 2011, a survey of the building history of Materials Chemistry can be found here... | ||
- | |||
- | beforeXXX: Foundry Institute | ||
- | AVZ: until 16.04.2008 | ||
- | Movement to BLB: 16.04.2008 | ||
- | Movement to new building: 04.10.2010 | ||
- | |||
- | ===== Building data ===== | ||
- | * building name: Neubau AVZ I | ||
- | * building no.: 2162 | ||
- | * address: Kopernikusstrasse 10, 52074 Aachen, Germany | ||
- | |||
- | ===== Floor plans ===== | ||
- | {{ : | ||
- | |||
- | MCh is located on four of the five floors (including the basement) of the building at Kopernikusstraße 10. | ||
- | |||
- | The following graphics show the use of the different floors and the designation of the rooms. | ||
- | On the right-hand side one can see a legend to identify the rooms. | ||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | {{ : | ||
- | **Basement** | ||
- | {{ : | ||
- | **Ground floor** | ||
- | {{ : | ||
- | **Second Floor** | ||
- | {{ : | ||
- | **Third Floor** | ||
- | |||
- | ===== Keys ===== | ||
- | |||
- | MCh uses semi-electronic keys. This means that the outside of the doors works electronically, | ||
- | From inside the doors work purely mechanically. Thus, you may leave any room at any time (but you will only get back if the your key is accepted). | ||
- | |||
- | When starting to work at MCh you will receive a key without deposit. The doors will be programmed accordingly. | ||
- | In case you are missing the key and it may be lost you have to inform the senior engineer, currently Dr. Simon Münstermann, | ||
- | The key will be deactivated. In case the key does not reappear you will have to pay the price for a new one, currently 90 €. | ||
- | |||
- | When you leave MCh please contact the senior engineer in advance to leave the key in time. | ||
- | |||
- | ===== Elevators ===== | ||
- | |||
- | There are 2 elevators available, one passsenger lift for approx. 6 persons in the front floor for storeys 1 to 4 (but not to the basement!) and one freight elevator with the dimensions | ||
- | * Length: 240 cm | ||
- | * Width: 150 cm | ||
- | * Height: 250 cm | ||
- | * Max. Load: 2000 kg | ||
- | |||
- | |||
- | ===== Vibration damping ===== | ||
- | |||
- | In the analytical lab section there are passive vibration platforms available, with the following parameters: | ||
- | |||
- | === Spring/ | ||
- | * Load capacity: 6 kN/item | ||
- | |||
- | === Large platforms === | ||
- | * No. of dampers: 6 | ||
- | * Length: 260 cm | ||
- | * Width: 200 cm | ||
- | * Thickness: 26 cm | ||
- | * Volume: 1.196 m3 | ||
- | * Weight: 2870 kg | ||
- | * Load capacity: 3600 kg | ||
- | * Net load: 730 kg | ||
- | |||
- | === Small platforms === | ||
- | * No. of dampers: 4 | ||
- | * Length: 200 cm | ||
- | * Width: 110 cm | ||
- | * Thickness: 26 cm | ||
- | * Volume: 0.506 m3 | ||
- | * Weight: 1214 kg | ||
- | * Load capacity: 2400 kg | ||
- | * Net load: 1186 kg | ||
blog/building.1537187902.txt.gz · Last modified: 2018/09/17 12:38 (external edit)